Progress reports in minutes




.png)



.png)


.png)
.png)

.png)
%201%20(2).png)





.png)



.png)


.png)
.png)

.png)
%201%20(2).png)

Don’t get left behind.
How Progress AI works
Try it yourself in this interactive preview
.avif)
Build your fleet (or let us do it for you)

Supported hardware
Our processing engine works with data from any camera source and supports automated flights, mission planning, and execution across drones, ground robots, docked systems, and 360 cameras.

Data on demand
Need the data but don't have pilots or hardware yet?
Use our services network to capture key corridors and facilities at the cadence you need, with processed maps, photos and models delivered straight into your DroneDeploy account.
Is DroneDeploy the right fit for your operations?
Project executives, VDC managers, superintendents and owners’ representatives tracking construction progress across active projects use Progress AI to get accurate, up-to-date work-in-place status without manual reporting. It connects captured site imagery to trade-level activity data by location, giving every team member in the delivery chain a current, verified view of progress across the portfolio.
Progress AI measures work-in-place. After a drone flight or 360 walk, Progress AI returns percent complete by location, trade status by date and area, and installed work across 80+ trade types. See which trades Progress AI tracks for the full list. No schedule or BIM model is required.
Progress AI has no prerequisites. It detects real-world progress directly from imagery – installed work, sequencing and changes – without a schedule or BIM. If you have a model, it can be incorporated, but it is not required to get started.
Within two hours of upload – the same day as capture. See the Progress AI help article for a full breakdown of what the report includes and how it is structured.
Both work. Progress AI processes aerial drone data and ground-level 360 Walks in the same session. Teams can capture from the air and the ground, and the report combines both data types.
Most legacy tools require weeks of setup, a dedicated BIM model and substantial onboarding overhead. Progress AI is live in under an hour at a fraction of the cost. That makes daily progress tracking viable on fit-outs, solar farms, data centers, and any project where regular capture makes sense.
Superintendents use it to coordinate daily crew work and catch trades falling behind. VDC teams use it to validate site against plan. Project executives and owners use it for portfolio oversight.
Progress AI runs at the portfolio level. Owners, developers and project executives see work-in-place status across all active projects from one place.
Progress AI runs on solar farms, data centers, tenant fit-outs and infrastructure projects in addition to traditional construction. The detection model covers a broad range of installation types and scales to any project size.
Progress AI goes live in under an hour. No BIM modeling, no dedicated integration work for most use cases. Your team captures data and receives the first report in the same session.
Reports are shareable by link or export. Owners and executives receive regular progress updates without a full platform seat. Each report includes visual evidence tied to location, date and trade.